About Project
Kontrolmatik has successfully completed a turnkey 132/11 kV High Voltage Substation Project in the Bazian region of Iraq.
Within the scope of the project, a 132/11 kV High Voltage Substation was delivered on a turnkey basis to strengthen the region’s power transmission and distribution infrastructure. The project covered engineering and detailed design, equipment supply, installation, testing, and commissioning activities.
Kontrolmatik executed the project in accordance with international standards, including the supply and installation of HV equipment, protection and control systems, SCADA integration, and on-site applications, ensuring the safe, reliable, and long-term operation of the substation.
Through this project, Kontrolmatik once again demonstrated its strong field experience in the Iraqi market and its capability to deliver integrated EPC solutions for high voltage substations.